| Diving |
• Air Diving 0'-220'
• Mixed Gas Diving 130'-300'
• Saturation Diving to 1,000'
|
| |
| Underwater Inspection |
• Level I & II Ultrasonics
• Level I & II Mag Particle
• Level II, III & IV Platform Inspections
• Non-Destructive Testing
• Underwater Video
• Underwater Photography
• ABS Inspections
• Germanischer Lloyds Hull Inspections
• Inspection Reports
• Site Surveys
• Underwater Grit Blasting
• Rig Move Surveys |
| |
| Construction |
• Anode Installations
• Cathodic Protection Installation
• Grinding
• Handjetting
• Jet Sled Burial
• Barge Support
• Pipe Cutting
• Pipeline Burial
• Pipeline Installation/Repair
• Pipeline Location
• Riser Installation/Repair
• Subsea Assembly Installation
• Underwater Welding
• Meteology |
| |
| Site Clearance Verification |
• ESCVM (patent pending) "Trawl Method"
(EPIC Site Clearance Verification Method)
• Diver Surveys |
|
|